Product Description
Product name |
Die Casting security Camera trim ring |
Process Method |
Die casting |
Material: |
Aluminum Alloy A380 |
Finish |
Powder Coated |
Color |
Cool Grey or Black |
Dimension |
116x 90 x 33mm |
Shape |
irregular |
Cavity |
2 |
Production Process |
Die casting, remove the sharp edge, CNC machining, Drill&tapping, powder coated, full inspection, Packing. |
Application |
Security camera |
Customize |
OEM |
Tooling lead time |
20 working days |
Mass production lead time |
20 working days |
MOQ/batch |
1000pcs |
Packing |
1piece / polybag, 108 pcs/carton, 30 cartons/pallet |
Tooling payment term |
50% in advance, balance after send the successful samples |
Mass order payment term |
30% deposit, 70% T/T before shipment |
Price term |
EXW, FOB, CIF |
FOB port |
Shenzhen or Hongkong |
Place of origin |
Guangdong, China. |
Certification |
ISO9001:2008 |
Production Process
Product Picture
More Information
Available Die Casting Material |
Aluminum ADC12, A380,A356, A413 |
Available Surface Treatment |
Sand blast, Powder Coating, Lacquering, E-coated |
Software |
Pro/E,UG, Solidworks, Auto CAD, PDF |
Advantages |
Own factory, Can provide good price ƒ High precision, tolerance can be within ±0.02mm. Small order also be welcomed. We can also provide one-stop service,including mould and assembly. |
Confidential service |
Your information is confidential. Your drawings are confidential. ƒ Your products are only for you. |
Guarantee |
2 years |
Quality Control Management
Item |
Question |
Answer |
1.1 |
Is there quality control on all production lines? |
Yes, all production lines have adequate quality control. |
1.2 |
Do the QA/QC inspectors work independently from the production line? |
Yes |
1.3 |
Who does the QC/QA Manager / Supervisor report to? |
Yes |
1.4 |
How many QA/QC inspectors in total? |
Yes |
1.5 |
Does the company prepare all of the necessary working instruction and inspection instruction before the mass production start? |
Yes |
1.6 |
Does the Working instruction contain all of the requirements from customer? |
Yes |
1.7 |
Does the worker been trained by the working instruction? |
Yes |
After Sales Service
Item |
Question |
Answer |
1.1 |
Is customer feedback including complaints, clearly recorded and maintained? |
Yes, with a standard feedback form and records. |
1.2 |
Are there any clear procedures for handling customer complaints? |
Yes, with clear procedures and written records |
1.3 |
Is there a closed-loop corrective action system in place? |
Yes |
1.4 |
Can finished/packaged products be traced by lot identification to the appropriate raw material test reports? |
Yes, with procedures to trace raw materials. |